Where Should I Place the Precolumn?

Feb 15, 2024 | Eicom Knowledge Base, ENO-20, ENO-30, FAQs

The article lists the proper placement of the precolumn inline in the system, and the components of the precolumn.

How to Inject Samples From a Manual Injector When an AS-700 Autosampler is set up With an ENO-20/30

Feb 15, 2024 | Eicom Knowledge Base, ENO-20, ENO-30, How to guides

This article outlines the proper set up and procedure for using a manual injector while the ENO-30 is connected to an autosampler.

ENO-20 Restoration Procedure

Feb 15, 2024 | Eicom Knowledge Base, ENO-20, Start-up guides

In the case that the ENO-20 has not been used for several weeks to months, this article explains the procedure to ensure the unit works as intended.

Issue With the ENO-20 not Starting; Sequencer Error

Feb 15, 2024 | Eicom Solutions, ENO-20, Hardware, Software

This article outlines the steps to boot up the ENO-20 through reprogramming of the sequencer within the detection oven.

Recent Articles

  • Low nitrate peak height with a newly installed reduction column
  • Dimensions for the MDX-310 Rack-in-Rotors
  • How to connect the FC-90 to an Android device via bluetooth
  • Dimensions for Sipper Tubes and Bottles
  • Priming Outlet Tubing for CX Probes for in-vitro use
    • Facebook
    • X
    • Instagram
    © Amuza Inc. All rights reserved. | Privacy Policy