Once the pump on the HTEC has been disassembled, this tutorial will provide guidance on how to reassemble the pump.
HTEC-ECD Articles
Tutorial-HTEC Piston Seal Quality Check, Replace
This article provides instructions and a video on how to inspect the piston and piston seal of the HTEC pump.
How to Clean the Check Valves
This article outlines the procedure to follow if one would like to clean the check valves on the inlets and outlets of the pump units.
Auto Zero: Confirming the Connection Between the AS-700 and the HTEC-500/510
This article outlines the procedure to confirm an auto-zero signal is sent from the autosampler to the HTEC unit.
How to Remove the Pump Unit from the HTEC-500/510
This article outlines the procedure to remove the pump unit from the HTEC unit.
What Concentration of Standard Solutions Should I Inject?
This article outlines how to use standard solutions to check for proper sensitivity of your system and explain the reasoning behind proper injection concentrations of standard solutions.
Separation of Norepinephrine and Epinephrine
This article outlines the types of columns to use for detecting and separating norepinephrine and epinephrine, depending on your specific application.
What is the Lifespan of the Acetylcholine (AC-GEL) Column?
This article outlines a recommended length of time for the column to be washed.
PEEK Tubing Volume/Length Conversion Chart By Color
This article contains a chart detailing the ID, uL/cm, and uL/in statistics of the different PEEK tubing colors.
How to Take Care of and use the Electrodes
The procedures to clean the electrodes are stated in this article. The tolerances the electrodes can take are also stated.
How Much Lab Space is Required for the HTEC?
The bench space required for an HTEC and HTEC + AS is around 0.5 and 1 meter respectively.